Improvement paln | Project type |
Design and stabilization of the structure bed using 2100 meters of column length with Deep soil mixing Length 9 m and diameter 80 cm | Administrative complex |
Project location | Technology |
Bousher | Deep soil mixing(DSM) |
2025 Omranista Company | All Rights Reserved.